参考文献

1. Ong, N. S. And Wong, Y. C., “Automatic subassemblydetection from a product model for disassembly sequence generation,” International Journal Advanced Manufacturing Technology, (15), 425-431 (1999).
2. Swee M. Mok, Chi-haur Wu And D.T.Lee, “A System for Analyzing Automatic Assembly and Disassembly,”IEEE Transactions on Robotics and Automation,18(2) , 3695-3700 (2000).
3. 财团法人中卫发展中心,中心卫星工厂制度推动手册(1999)。
4. 林吉宏,「组装次序与加工次序之整合规划研究—应用基因算法」,硕士论文,私立元智大学(2000)。
5. Lambert, A. J. D., “Optimal disassembly of complex products,”International Journal of Production Research, 35(9), 2509-2523 (1997).
6. Lin, A. C. And Chang, T. C., “An integrated approach to automated assembly planning for three-dimensional mechanical products ,” International Journal of Production Research, 30(5), 1201-1227 (1993).