What affects the price of boards?
---------------------------------
http://www.murrietta.com
Number of layers: Limit the number of layers as much as possible. If higher quantities are anticipated, spend the extra time and money in engineering to minimize layer count. Layout engineering is a one time expense, manufacturing is not!
Quantities ordered: Order the higher quantities whenever possible. You may be better off maintaining a higher inventory of say 3 or 5 months worth. Smaller runs mean your board house is less likely to panelize and maximize the number of images on a panel. Larger runs are simply more efficient. If your board manufacturer has to stock them until you need them, you can bet there is a hidden charge somewhere.
Delivery time: Quick delivery greatly influences board prices. Allow as much time as schedule permits. Don't ask for a rush only to find out a special order chip or transformer has a 10 week delivery and you cannot proceed with assembly. Longer lead times allow your board house flexibility for other quick turn work, so yours can be at lower cost.
Number of hole sizes: Limit the number of hole sizes. Each additional size adds to the cost. Layout designers have considerable flexibility since hole sizes can be .007 - .015 larger than component lead sizes.
Small hole size: Try not to use hole sizes smaller than .028. They limit stack drilling, and drilling one board at a time greatly increases machine time. Drills also break more often and copper plating becomes more difficult. Holes .021 and smaller must be stack drilled 1 deep. Holes .022 thru .027 can be stack drilled 2 deep. Holes .028 and larger can be stack drilled 3 deep.
Annular ring: Try to provide pads that are .020 larger than hole size. Planned annular ring of .010 is good design criteria. Allowances must be made for etching, lamination, drill position, front to back layer registration and film stability. Smaller annular ring is certainly possible, but at the expense of lower yields and increased manufacturing difficulty which results in higher cost.